<p>Installation time depends on crane type and site conditions. For standard overhead crane (LD single-girder, LH double-girder) in a prepared workshop, installation biasanya takes 5–10 working days. Larger derek gantry (MG, RMG) or metallurgical cranes may require 15–30 days, including on-site assembly and testing.</p><p>Our team provides detailed installation drawings and remote guidance. For projects needing full support, we can arrange certified engineers for on-site supervision (travel costs extra). Production lead time is 30–45 days, and all cranes come with a 12-month warranty.</p><p>For a project-specific timeline, contact us on WhatsApp +86 19392777259.</p>