Home · Thailand · Shipbuilding

Thailand Shipbuilding Cranes

Direct-from-factory cranes for Thailand Shipbuilding projects — CIF to Laem Chabang, sales support in Thai/English.

Why Thailand Shipbuilding Buyers Choose Chunhua

For Thailand buyers in the Shipbuilding sector, the standard configuration is MGH/MG large gantry, 150-300T capacity — engineered specifically for shipyard operations covering ship hull segments, marine engine assembly, offshore platforms.

Local market context: EEC auto and chemical cluster. Our project engineering team is familiar with the regulatory and engineering norms of Southeast Asia projects. CIF shipping to Laem Chabang with all major liner schedules supported.

Project workflow: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD drawing + price within 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Laem Chabang. Payment: 30% T/T deposit + 70% T/T or L/C at sight. Certification: CE, CCC, SGS available per project.

RECOMMENDED MODELS

Shipbuilding Crane Models for Thailand

Crane Quote for Thailand Shipbuilding Project

Send your specs (capacity / span / lifting height / port of Laem Chabang) — we reply with model + CAD drawing + CIF price within 4 hours, in Thai/English.

Chat with us
Reply within minutes · or WhatsApp +86 158 5515 8769
Prefer WhatsApp? Tap here →