Home · Iran · Subway / Tunnel

Iran Subway / Tunnel Cranes

Direct-from-factory cranes for Iran Subway / Tunnel projects — CIF to Bandar Abbas, sales support in Persian/English.

Why Iran Subway / Tunnel Buyers Choose Chunhua

For Iran buyers in the Subway / Tunnel sector, the standard configuration is MGH scramble crane, 150T — engineered specifically for subway tunnel construction operations covering TBM assembly, segment handling.

Local market context: Steel and petrochem expansion. Our project engineering team is familiar with the regulatory and engineering norms of Middle East projects. CIF shipping to Bandar Abbas with all major liner schedules supported.

Project workflow: send your facility specs (workshop dimensions, capacity needs, environment conditions, certification requirements) on WhatsApp — we reply with recommended model + CAD drawing + price within 4 hours. Lead time 30-45 days production, sea freight 25-45 days to Bandar Abbas. Payment: 30% T/T deposit + 70% T/T or L/C at sight. Certification: CE, CCC, SGS available per project.

RECOMMENDED MODELS

Subway / Tunnel Crane Models for Iran

Crane Quote for Iran Subway / Tunnel Project

Send your specs (capacity / span / lifting height / port of Bandar Abbas) — we reply with model + CAD drawing + CIF price within 4 hours, in Persian/English.

Chat with us
Reply within minutes · or WhatsApp +86 193 9277 7259
Prefer WhatsApp? Tap here →